GCM Installation Progress
Not long ago the GCM left the WARDJet facility and made it's way to the UK. It shipped in several parts due to it's overwhelming size. The side supports that the gantry will be held on are close to final installation with the cement set and the linear rails being installed. One of the rails is already set and is being thoroughly checked for accuracy using a laser tracker. Soon the crossbeam will be arriving and the WARDJet team will be hard at work continuing the installation.
Labels: cnc milling, G-Series, GCM, installation, Laser Tracker
posted by Unknown at 12:11 PM


0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home